PROJECT OVERVIEW

After extensive rainfall, multiple landslips in varying sizes had occurred across several locations along a 51km road corridor. Consulting engineers were engaged to complete a geotechnical assessment and design remediation works. In order to do this, they required accurate terrain modelling and detailed visualisation of the sites for inspection and design purposes.

The local council asset managers decided to capture the spatial and visual data of the entire 51km of road corridor instead of just the individual landslip sites. This delivered economies of scale while creating a digital asset of their entire road corridor that could be used for other purposes.

Project Scope
Drone LiDAR & Photogrammetry
Drone LiDAR & Photogrammetry
Terrain Modelling
Terrain Modelling
Digital Twin
Digital Twin
DIOSPATIAL SOLUTION

Diospatial developed a drone-based reality capture solution that utilized LiDAR and photogrammetry to capture and generate a scale accurate, high detail digital twin.

Drone LiDAR was used for its ability to penetrate vegetation and to efficiently cover a large area. The LiDAR survey was captured at a high point density and the point cloud was classified for ground and non-ground points. From this, the digital terrain model (DTM) and TIN could be produced, which was then used to derive elevation contours, surface drainage, and extract key features.

High resolution images were captured of the specific landslip sites as well as general images of the entire 51km of road. The high resolution images were processed in photogrammetry software to produce 3D digital twins of the landslips. The general images of the entire corridor were compiled in to an orthophoto for visualisation. The imagery captured provided rich visualisation to a level of detail suitable for the purposes required, including inspection and remote planning of remediation works.

Aerial LiDAR and imagery was captured of the entire ~51km of road corridor to support geotechnical assessment and design.

The final geospatial deliverables were shared in their specialist software formats, as well as compiled in to a web-based GIS platform, Pointerra, which allowed project stakeholders to easily visualise, share and collaborate as they completed the geotechnical assessment and design solution.

Drone photogrammetry was used to generate a high detail spatially accurate reality model of specific landslip sites for close visual inspection and design of remediation works.
Network of ground control points were established to ensure the geospatial data was scale and geo-accurate.

 

LiDAR point cloud
Drone LiDAR was captured at high point density and connected to a robust ground control network to ensure accurate capture of the ground surface throughout the survey area. The point cloud was then classified for ground returns using an automated classification algorithm and manually refined in accordance with ‘Level 3-Ground Control’ specifications in the ICSM LiDAR Guidelines. This represents the highest quality of ground classification achievable from LiDAR survey methods and ensures reliability of the terrain modelling and suitability for detailed design of remediation solutions.
Surface Ground Mesh with elevation contours and watershed analysis
Ground classified LiDAR points were then triangulated to develop a bar earth ground surface model, from which elevation contours and surface drainage flows paths were developed. All data was referenced to the survey control network and validated to achieve better than 100mm accuracy at 95% confidence interval.
Ground surface TIN
A ground surface TIN model for the entire 51km road alignment was developed from the LiDAR point cloud and assessed for accuracy against the project survey control network, achieving better than 100mm vertical accuracy at 95% confidence interval.
3D digital twin with close up view
High Detail Photogrammetry modelling (same area as image above), was completed over specific problem sites to further inform assessment and design. The photogrammetry capture method was optimized to ensure detail of road level features even in forested areas.